Maintenance and Repair
61/76
3 842 358 724/2013-04, MIT: BS 2/C-… + BS 2/R-…,
Bosch Rexroth AG
Fig. 44:
3 842 530 417
19
18
19
18
21
20
21
17
14
13
15
17
12
16
2
)
547 601-51
8 981 010 511
8 981 010 510
3 842 530 417
Exchanging the conveyor chain: BS 2/C-100, BS 2/R-300, MA = M (3/3)
12.
Pull the chain in the top
guide profi le up to the
drive head.
13.
Hold the drive train over
the drive heads.
14.
Lead the chain over the
drive wheels through the
drive head downwards
to the chain tensioner.
15.
Insert the drive train into
the drive heads.
16.
Lift the chain up slightly
and place the slider into
the drive heads.
17.
Mount the covers on the
drive and return head
18.
With the disassembly
tool remove enough
excess chain links to be
able to close the chain
as tightly as possible at
the tension wheel.
19.
Lubricate the master link
and close the chain.
20.
Release the chain
tensioner.
Check the tension of the
chain.
21.
Mount the external
housing element halves.
EN
GLISH
358724_2013_04_EN.indd 61
358724_2013_04_EN.indd 61
27.05.2013 13:08:13
27.05.2013 13:08:13