1 689 988 238
2012-11-06
|
Robert Bosch GmbH
110 | ACS 651/751 | Program description
en
i
The recovery phase continues till the absolute
pressure is 600 mbar. When the recovery is com-
pleted, other service phases are executed auto-
matically.
After the filling phase is completed, the
“Hose
Drain”
screen is displayed.
i
If any error occurs during recovery, vacuuming or oil/
UV dye recharge phases, the automatic mode will not
proceed to the filling phase and the
“Hose Drain”
screen will not be displayed.
Caution - Risk of frostbite!
If refrigerant escapes, there is a risk of
frostbite to the hands and body.
¶
Carefully disconnect filling hoses as all
hoses can contain pressurized refrigerant.
i
See chapter 6.5.1 and execute steps 21 to 25 to
complete the service.
6.13.2 Executing recovery when the engine and the
A/C system are OK
i
After executing step 19 of chapter 6.13.1, the follow-
ing screen is displayed.
1.
Follow the instructions on the screen and press
E
.
The following screen is displayed.
2.
Follow the instruction on the screen and press
E
.
The recovery phase is initiated.
i
After the oil drain is completed, the following
screen is displayed.