Operation
Page 2 / 24
EPA assembly line for DaeP
Assembly Station
VPP 21
Station x
Station 2
Station 3
Station 4
Station 5
Station 6
Station 7
Station 8
Station 9
Station 10
Station 11
Station 12
Station 13
Station 14
Station 15
Station 16
Station 17
Station 18
Station 19
Station 20
Station 21
Station 22
Station 23
Station 24
Station 25
Station 26
Station 27
Station 28
Station 29
Station 30
Station 31
Station 32
Station 33
Station 34
Station 35
Station 36
Station 37
Station 38
Station 39
Station 40
Station 50
Station 60
Station 70
Station 80
Station 90
Station 100
Station 110
Station 120
Station 130
Station 140
Station 150
Station 160
Station 170
Station 180
Station 190
Station 200
Station 210
Station 220
Station 230
Station 240
Station 250
Station 260
Station 270
M.3000314.190_0843.195.960 /
V0.0_0613_EN_PA--ATMO2
Robert Bosch GmbH
Commissioning
Prior to startup
Take heed of the section ”Safety measures”!
Prior to switching On the machine please ensure that the machine startup
will not endanger anybody.
The machine may be operated only after all guard devices and safety
relevant devices, e.g. removable/unlockable guard devices, EMERGENCY
STOP devices, noise insulation systems, and exhaust devices are in place
and fully functional!
Production materials and auxiliary materials
To ensure a smooth production sequence the following production means
and auxiliary means must be provided for the specific cell.