Installation Manual
Bosch Climate 5000 Series Ducted Type (Medium & High Static) Air Conditioner / Heat Pump
| 13
Bosch Thermotechnology Corp.
|
05.2019
Data subject to change
Step 2: Hang indoor unit
Wood:
Secure wood mounting to the beam with screws, then install the hanging screw
bolts.
Figure 9
Wood mounting
Roof beam
Hanging screw bolts
Ceiling
New concrete:
Inlay or embed the screw bolts.
Figure 10
(Blade shape insert)
(Slide insert)
Original concrete:
Use an embedding screw bolt, crock, and stick harness.
Figure 11
Steel bar
Embedding screw bolt
(Pipe hanging and embedding screw bolt)
Steel roof beam structure:
Install and use the supporting steel angle.
Figure 12
Hanging screw bolt
Hanging
bolts
Supporting
angle steel
NOTICE: PROPERTY DAMAGE
The indoor unit must be completely aligned with the hole.
Ensure that the unit and the hole are the same size before
proceeding.
1.
After selecting an installation location, align the refrigerant pipes, drain
pipes, as well as indoor and outdoor wires with their connection points
before mounting the unit.
2.
Install hanging screw bolts.
3.
Connect pipes and wires after installing indoor unit.
4.
Drill 4 holes 10cm (4in.) deep at the ceiling hook positions. Be sure to hold
the drill at a 90° angle to the ceiling.
5.
Secure the bolt using the washers and nuts provided.
6.
Install the four suspension bolts.
7.
Mount the indoor unit with at least two people to lift and secure it. Insert
suspension bolts into the unit’s hanging holes. Fasten them using the
washers and nuts provided.
Figure 13
8.
Mount the indoor unit onto the hanging screw bolts. Position the indoor unit
fl at using a level indicator to prevent leaks.
Figure 14
Screw nut
Washer
Hanging screw bolt
Overhang part
Shockproof cushion
Confi rm the minimum drain tilt is 1/100 or more.