1 4 |
Bosch Climate 5000 Series Ducted Type (Medium & High Static) Air Conditioner / Heat Pump
Installation Manual
05.2019
|
Bosch Thermotechnology Corp.
Data subject to change
Step 3: Installing the dust proof net and canvas air passage
1.
Install the dust proof net according to the installation manual.
2.
Install the canvas air passage underneath the dust proof net.
Step 4: Duct and accessories installation
1.
The air inlet and air outlet duct should be far enough to avoid ventilation short
circuiting.
2.
Attach the duct to the indoor air outlet/inlet fl ange by using the type ST3.9 x
10 screw.
3.
Connect the duct according to the following diagram:
Figure 15
Canvas tie-in
Canvas tie-in
Air outlet
Isolation booth
Isolation booth
checking orifice
Air inlet
Air dust filter
4.
Refer to the following static pressure guidelines when installing the indoor
unit.
MODEL (Btu/h)
Static Pressure (Pa/in.wg)
9k/12k
0~40/0~0.16
18k
0~100/0~0.40
24k/36k/48k
0~160/0~0.64
60k
0~200/0~0.80
Table 5
Change the fan motor static pressure according to external duct static pressure.
Do not use indoor unit to support connecting duct's weight
When connecting the duct, use a nonflammable canvas tie-in
Change the fan motor static pressure corresponding to
external duct static pressure
An internal duct under-layer can be added to reduce noise
Step 5: Adjust the air inlet direction (If required from rear to bottom,
9k ~ 48k models only)
1.
Take off the ventilation panel and fl ange.
Figure 16
Air return flange
Ventilation panel
2.
Change the mounting positions of the ventilation panel and return air fl ange.
3.
When installing the fi lter, fi t it into the fl ange as illustrated in the following
fi gure.
Figure 17
Air return flange
Ventilation panel
All the fi gures in this manual are for demonstration purposes only. The
air conditioner you have purchased may be slightly diff erent in design,
though similar in shape.
Step 6: Fresh air duct installation
Figure 18
Models: 9k ~ 60k
Ø125mm (4.92”)
Ø160mm (6.3”)
Duct joint for fresh air