Duct smoke housing, 2-wire
Mounting | en
7
Bosch Security Systems, Inc.
Installation manual
2017.04 | 7.0 | F.01U.071.685
3
Mounting
3.1
Preparing the duct
Before installing the duct detector, you must verify the duct air flow and velocity. The detector
is designed for use in air handling systems with air velocities between 300 ft/min and 4000 ft/
min (1.5 m/s to 20.3 m/s). Check the HVAC engineering specifications to ensure the air
velocity in the duct falls within these parameters. If necessary, use a velocity meter to check
the air velocity in the duct.
3.2
Determining mounting location
To obtain a representative air sample, avoid stratification and dead air space. These
conditions can be caused by return duct openings, sharp turns, connections, or long,
uninterrupted runs. For this reason, place the duct housing in the range of six to ten times the
width of the duct from any uninterrupted run (see the following figure).
Figure 3.1: Typical duct detector placement
1 Bend or other obstruction
2 6 to 10 times the width oft he duct
3 Width of duct
4 Return air inlet
The D340 can be mounted in any direction of 90° increments without regard to the air flow
direction (see the following figure).
Summary of Contents for D340
Page 1: ...Duct smoke housing 2 wire D340 D340P en Installation manual ...
Page 2: ......
Page 23: ......