RAID Subsystem DVA-16K | Installation Manual
Subsystem Connection and Operation | en
41
Bosch Security System
F.01U.027.799 | V2 | 2008.08
The LCD screen startup sequence is shown and described in the sequence below:
5.5
Power Off Procedure
If you wish to power down the RAID subsystem, please follow these steps:
1.
Stop I/O access to the system.
Use the software provided on the host computer to stop all IO accesses to the RAID sub-
system. Please refer to the user’s manual that came with your host computer.
2.
Flush the cache.
Use the “Shutdown Controller” function to flush all cached data. This prepares the RAID
subsystem to be powered down.
3.
Turn off the power.
Turn off the power switches at the top of the rear panel. Once the subsystem has been
powered down, other devices that are connected to the subsystem may be powered
down.
Initializing….
Please Wait...
This screen appears when the PSUs are turned on.
DVA-16K
Modem Not Config
This screen appears after the initialization process.
It clearly shows the model name.
DVA-16K
256MB RAM, Wait…
Verifying installed cache memory.
DVA-16K
No Host LUN
System is ready. You can now start to configure the
subsystem.
i
NOTICE!
If you wish to power down the RAID subsystem, please ensure that no time-consuming pro-
cesses, like a “logical drive parity” check or a “background scrub,” are running.
Summary of Contents for DVA-16K SCSI
Page 1: ...RAID Subsystem DVA 16K DVA 16K SCSI Premium Series en Installation Manual ...
Page 2: ......
Page 71: ......