English 2
Power Requirements and Electrical Grounding Instructions
•
Before installing, turn power OFF at the service panel. Lock service panel to
prevent power from being turned ON accidentally.
•
Know how to disconnect the power to the range at the circuit breaker or fuse
box in case of an emergency.Installation
Installation
Before You Begin
Tools and Parts Needed
•
50 Amp Power Supply Cord Kit (not necessary for Canadian installations)
•
Measuring Tape
•
Phillips Head Screwdriver
•
1-1/4” (31.8 mm) Wrench
•
Pencil
•
T-20 Torx Screwdriver
•
Screws (2) and Anchors (2) for Anti-Tip Bracket (Style will vary depending on
mounting surface)
•
Level
•
Drill and Drill Bit
•
Safety Gloves and Goggles
•
Tape (Optional)
•
Cloth or Cardboard (Optional - to Protect Floor)
Additional Parts Needed For
Hard Wire Installations
•
Flexible Conduit (For Hard Wire Installation Only)
•
Torque Wrench (For Hard Wire Installation Only)
•
Note:
Power Supply Cord Kit Not Necessary For Hard Wire Installations
Parts Included
•
Anti-Tip Bracket
•
Terminal Lugs (For Use With Hard Wire Installations) (not necessary for
Canadian installations)
Cabinet Requirements
This unit is designed for installation near adjacent walls and projecting surfaces
constructed of combustible materials. Allow a minimum of 30 inches (76.2 cm)
between cabinets where range is to be installed (0.47” (12 mm) clearance from
range sidewall to cabinet required in Canada).
Figure 1:
Cabinet Clearances
30” (76.2 cm) Minimum
between cabinets