Bosch Greenstar
Applications Manual
Bosch Thermotechnology Corp.
Data subject to change
Gas
Supply
A
B
C
System Return
System Supply
Boiler Return
Boiler Supply
Piping Section
Description
Requirements
A
System Supply
Minimum length of 4 x pipe diameter based
on System header pipe size
B
Closely Spaced Tees
Maximum distance of 4 x pipe diameter
(center-to-center) based on System header
pipe size
C
System Return
Minimum length of 8 x pipe diameter based
on System header pipe
Boiler Input
(btu/hr)
Boiler Supply/Return pipe diameter
System Supply/Return Header pipe diameter*
57,000
1"
1"
79,000
1"
1"
100,000
1"
1.25"
131,000
1"
1.25"
151,000
1"
1.5"
System Header Pipe
*based on 2 – 4 ft/sec flow velocity.
system
¨
T of 20°
system
¨
T of 10°
1.25"
1.25"
1.5"
1.5"
2.0"
Appendix B
: Primary/Secondary piping for Greenstar Wall Boiler
Summary of Contents for FS 100
Page 2: ...2 Bosch Greenstar Applications Manual Bosch Thermotechnology Corp Data subject to change ...
Page 73: ...Applications Manual Bosch Greenstar 73 Bosch Thermotechnology Corp Data subject to change ...
Page 74: ...74 Bosch Greenstar Applications Manual Bosch Thermotechnology Corp Data subject to change ...
Page 75: ...Applications Manual Bosch Greenstar 75 Bosch Thermotechnology Corp Data subject to change ...