Communications Systems

 - PVA-1KS Call station key switch

2 | 3

i

Notice

Connect the key switch as shown in the follow-
ing figure (normally closed contact, NCC) to
lock the call station via the key switch!

8. Note the connection sequence of the ribbon

cable. The two external cables 1 (red) and 4
(green) must be cut as close to the cut-off point
as possible and isolated. The two internal cables 2
(green) and 3 (green) must be soldered to switch
connections 3 and 4. The polarity is not important.

9. Depending on whether the right/middle/left in-

stallation location will be used, plug the ribbon
cable into plug connector CN201/CN202/CN203
on the circuit board.

10. Plug the connecting cable into CN1 again.

11. Re-attach the call station baseplate.

12. Attach the connections.

13. Configure the key switch in IRIS-Net.

R

2

1

0

k

1 rt

2 gr

3 gr

4 gr

CN1-4

CN1-3

CN1-2

CN1-1

1

2

R1

10k

3

4

Fig. 1: Connecting the key switch as normally closed
contact (NCC) for key lock function

R

2

1

0

k

1 rt

2 gr

3 gr

4 gr

CN1-4

CN1-3

CN1-2

CN1-1

1

2

R1

10k

3

4

Fig. 2: Connecting the key switch as normally open
contact (NOC) for special purposes

Parts included

Quantity

Component

1

Key switch

1

Preconfigured 4-pin connecting cable

2

Resistor 10 kΩ

1

Installation note

Technical specifications

Mechanical

Product dimensions (Height x Width
x Depth)

45 mm x 19 mm x 24 mm

Net weight

0.03 kg

Shipping weight

0.04 kg

Environmental

Operating temperature

-5 °C to +45 °C (+23 °F to +113 °F)

Storage and transport temperature

-25 °C to +70 °C (-13 °F to +158 °F)

Humidity (non-condensing)

5% to 90%

Altitude

Up to 2000 m

Ordering information

PVA-1KS Call station key switch

Optional key switch that can be installed in the
PVA-15CST Call station.
Order number 

PVA-1KS | F.01U.397.468 F.01U.312.984

Services

EWE-PAIOCS-IW 12 mths wrty ext. Plena all-in-1 cal

12 months warranty extension
Order number 

EWE-PAIOCS-IW | F.01U.360.713