Commissioning 47/64
RE 92750-01-B/06.2018, A10VG, Series 10,
Bosch Rexroth AG
8 Commissioning
To efficiently operate the axial piston unit, it is necessary to calibrate the electric
control (ET), since each hydraulic component has manufacturing tolerances that
can also affect the electronic control. More information can be found in the
component class specification 92003-CC-0011_ETPump; see Table 1 “Required
and supplementary documentation” on page 5.
wARnInG
Danger while working in the danger zone of a machine/system!
Risk of death or serious injury!
▶
Pay attention to and eliminate potential danger sources before operating the
axial piston unit.
▶
Make sure no one is in the danger zone of the machine/system.
▶
The emergency stop button for the machine/system should be within the
operator's reach.
▶
Always follow the instructions of the machine/system manufacturer during
commissioning.
CAUTIOn
Commissioning an improperly installed product!
Risk of injury and property damage!
▶
Make sure all electrical and hydraulic ports are connected or plugged.
▶
Only commission a completely installed, fully functioning product with original
accessories from Bosch Rexroth.
8.1 Initial commissioning
During all commissioning work on the axial piston unit, observe the general safety
instructions and intended use detailed in chapter 2 “Safety instructions” on
page 9.
▶
Connect the pressure gauge for the boost-pressure, working pressure, case
pressure and suction pressure to the specified measuring points on the axial
piston unit or in the hydraulic system to check the technical data during initial
operation.
▶
During commissioning, monitor the temperature of the hydraulic fluid in the
reservoir to ensure that it lies within permissible viscosity limits.