10
Handling and transport
10.1
Delivery status
10.1.1
General
BA1N energy storage devices are delivered in wooden crates. Packing units
on pallets are secured with straps.
When being cut open, the retaining straps
may make uncontrolled movements which
may result in injuries.
CAUTION
⇒Maintain a sufficient distance and carefully cut the tightening straps.
Plug connections are provided with protective sleeves ex works. Only remove
the protective sleeves immediately before starting assembly.
10.1.2
Factory test
All BA1N energy storage devices are subjected to the following tests at the
factory:
Electrical testing
●
High-voltage test according to EN 60034-1 (pursuant to VDE 0530-1)
●
Insulation resistance according to EN 60204-1/1.92, Section 20.3
●
Protective conductor connection according to EN 60204-1/1.92, Section
20.3
Mechanical testing
●
Concentricity and position tolerances of shaft end and mounting flange
according to DIN 42955
●
Vibration measurement according to DIN 2373
10.1.3
Customer test
Since all BA1N energy storage devices undergo a standardized test proce‐
dure, high-voltage tests on the customer side are not required. BA1N energy
storage devices could be damaged if they are subjected to repeated high-
voltage tests.
Destruction of the components due to im‐
properly executed high-voltage test! Loss of
warranty!
NOTICE
⇒ Avoid repeated testing.
⇒Observe the regulations of EN 60034-1 (pursuant to VDE 0530-1).
10.2
Identification
The total scope of a delivery is stated on the delivery note or shipping docu‐
ment. However, the contents of a delivery may be distributed over several
packages. Each package can be identified by a forwarding label. In addition,
each device has an individual name plate containing the device designation
and technical data.
Compare the ordered and delivered types after receipt of the
goods. Reclaim deviations immediately.
BA1N Kinetic Energy Buffer
47/73
Handling and transport
R911393264_Edition 01 Bosch Rexroth AG
Summary of Contents for Rexroth BA1N
Page 1: ...BA1N Kinetic Energy Buffer Project Planning Manual R911393264 Edition 01 ...
Page 30: ...24 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 32: ...26 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 40: ...34 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 52: ...46 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 62: ...56 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 74: ...68 73 BA1N Kinetic Energy Buffer Bosch Rexroth AG R911393264_Edition 01 ...
Page 77: ...Notes BA1N Kinetic Energy Buffer 71 73 ...
Page 78: ...Notes 72 73 BA1N Kinetic Energy Buffer ...