Checklist to plan and use the module
No. Request (optional)
Yes
No
Notes
16
Were the specifications and electric installation
specified (e.g. EPLAN) and provided to the exe‐
cuting bodies?
□
□
17
Were the specifications for the commissioning
specified and provided to the executing bodies?
□
□
Date
Signature
(editor)
Date
Signature
(tester)
DOK-CONTRL-S20*SSDO*8*-AP02-EN-P
Bosch Rexroth AG
71/85
IndraControl S20 Module With Safe Digital Outputs S20-SSDO-8/3
Checklists