Checklist to commission and parameterize the module
16
Are there any test intervals specified to test the
switch-off capability of the actuators if required
to meet an SIL/SIL CL/cat./PL?
□
17
Is it ensured that a purposeful start of hazard‐
ous motions is only possible when the danger
zone can be seen?
□
Date
Signature (edi‐
tor)
Date
Signature (test‐
er)
DOK-CONTRL-S20*SSDO*8*-AP02-EN-P
Bosch Rexroth AG
75/85
IndraControl S20 Module With Safe Digital Outputs S20-SSDO-8/3
Checklists