![background image](http://html.mh-extra.com/html/bosch/rexroth-lu-2/rexroth-lu-2_assembly-instructions-manual_46205047.webp)
Maintenance and repair
47/54
3 842 358 814/2017-01, MIT: LU 2,
Bosch Rexroth AG
Fig. 23:
5
4
3
358 814-24
GN
GN
6
6
7
2
1
Assemble oil container LC 2
Please note
:
The oil container may only
be screwed in 1x.
f
Install drive on oil
container LC 2
see page 31.
f
Install drive with oil
container LC 2 in
support bracket
see page 32.
Please note
:
• After connecting the
power cable and with
supply voltage present,
the LED indicators
fl ash green (GN) in
5 s intervals.
• A fl ashing arrow icon
appears
d
in the display.
• The lubricating unit is ready
for operation with the
parameters previously set.
Please note
:
Only in pulse mode
:
After
re-establishing the supply
voltage
a delivery process
is carried out. During the
delivery the drive and the
LED indicators fl ash at
1 s intervals.
EN
GLISH
358814_2017_01_EN.indd 47
16.01.2017 13:38:19