42/96
Pressure and flow control system SYDFE1 series 2X, 3X
| Mounting
Bosch Rexroth AG, Edition 10.2021, RE 30011-B
7 Mounting
Before starting to install the system, have the following documents at hand:
• Hydraulic circuit diagram for the system (made available by the machine
manufacturer)
• Data sheet of the SYDFE1 control system (contains the technical data)
• Order confirmation (contains the preset data of the SYDFE1 control system)
7.1
UNPACKING
CAUTION
Parts falling out!
If the packaging is not opened correctly, parts may fall out and cause injury.
▶ Put the packaging on level, bearing ground.
▶ Only open the packaging from the top.
SYDFE1 control systems are delivered packed in an anti-corrosion foil made of
polyethylene material.
▶ Dispose of the packaging in accordance with the national regulations of your
country.
7.2
INSTALLATION CONDITIONS
▶ Adhere to all limits specified in the data sheet regarding temperature, viscosity,
cleanliness of the hydraulic fluid.
▶ Make certain that the case of the SYDFE1 control system is filled with hydraulic
fluid during commissioning and in operation. This is also to be observed
following relatively long standstill periods as the SYDFE1 control system may
empty via the hydraulic lines.
▶ To achieve favorable noise values, decouple all connecting lines from all
components that can vibrate (e.g. tank) using elastic elements.
▶ Make certain that the suction line, case drain line, and return line flow into the
tank below the minimum fluid level in all operational states.
▶ Strictly observe utmost cleanliness. The SYDFE1 control system must be
installed without any contamination. Contamination of the hydraulic fluid can
significantly affect the service life of the SYDFE1 control system.
▶ Do not use cotton waste or linty cloths for cleaning.
▶ Use suitable liquid detergents to remove lubricants and other difficult-to-
remove dirt. Detergents must not penetrate the hydraulic system.