Installation Instructions
25
Concluding System Installation
1. Make sure that bridge B1 on the control unit is closed for normal operation. Replace the con-
trol unit cover.
2. Make sure the red and green LEDs on the reader are off (= normal operating condition).
3. Arm and then disarm each key (see following chapter) to make sure that the programming is
correct. Inform the operator of this step in advance to avoid any unnecessary interruption of
operations.
Note:
The bolt will engage when the bolt contact is closed as long as the magnetic contact (PL1)
is closed.