INSPECTION AND SERVICE
Component Access
1. Removing outer case
1.
Remove bottom panel by pulling it forward
and off.
1.1
Undo and remove 2 screws (A) securing
boiler casing at the top of the appliance.
1.2
Undo but do not remove the 2 screws
(B) securing boiler casing at the bottom of
the appliance.
1.3
Pull case forward and remove.
2. Adjusting boiler control to
service position
2.1
Remove screw (C) securing control.
2.2
Gently pull forward until it comes to
rest in service position.
Primary Heat Exchanger
There is a special accessory kit available
specifically designed for cleaning the
heat exchanger. If required order
7 716 192 312.
3
Check fan pressure at the test point next to
the fan using an electronic manometer.
The boiler must be run at maximum output.
Pressure will read negative and be greater
than:
Natural gas
LPG
12i System - 3.1 mbar 12i System - 4.9 mbar
24i System - 3.1mbar 24i System - 4.1 mbar
Pressures measured below these figures
will indicate that the heat exchanger will
require cleaning.
A
1.1
1.2
1.3
B
1.
C
2.1
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
8 716 107 375a (02/05)
36
SER
V
IC
IN
G
&
SP
A
RES
2.2