Q
INSPECTION AND SERVICE
9
Remove burner (L).
Remove top baffle (M).
Remove baffle (N).
Remove the two hexagon headed screws (O)
retaining the access cover (P) on the sump.
Access the heat exchanger flue ways by
inserting the soft brush (7 716 192 312)
through the top access hole in the casing (Q).
Clean heat exchanger flue ways (R) using the
cleaning brush (7 716 192 312) removing
any debris from the access point in the sump.
Clean around sealing surface on sump and
replace access cover (P). Using a suitable
container to collect water from siphon
connection at the base of the boiler flush
heat exchanger with water.
Re-assemble ensuring that baffles (N) and
(M) are refitted correctly.
When re-fitting the burner ensure that it fits
centrally within the heat exchanger and
location tabs are situated in location holes.
Ensure seal is replaced with new seal
and is correctly fitted.
Check the siphon unit for blockage before
refitting to boiler.
Reassemble and check combustion as
stated in the gas conversion section.
NOTE: To show the heat exchanger more
clearly it has been shown external to the
appliance
9
L
M
N
0
P
R
THE BAFFLES (N) AND (M) MUST
B E R E F IT TE D I NTO TH E H E AT
E XCHANG E R AS S HOW N I N 9.
FAILURE TO DO SO MAY RESULT
IN DAMAGE TO THE BOILER
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 12i System/24i System
8 716 107 375a (02/05)
40
SER
V
IC
IN
G
&
SP
A
RES
I M P ORTANT:
I F TH E JOI NT
BETWEEN THE AIR/GAS MANIFOLD
AN D TH E H EAT E XCHANG E R I S
DISTURBED THE SEALING GASKET
MUST BE REPLACED.