INSTALLATION
6 720 807 912 (2015/10)
5
4
INSTALLATION
4.1
BALANCED LOW LEVEL DISCHARGE FLUE
4.1.1
FLUE COMPONENTS
Fig. 5
Flue components
[1]
Air inlet clamp
[2]
Telescopic air inlet section & acoustic insulation
[3]
80mm Ø flue pipe (including seal)
[4]
Air box mounting bracket
[5]
Air box gasket
[6]
Air box
[7]
Air box cover
[8]
Flue terminal
[9]
Air box cover screws x 6
[10] Mounting screws x 4 (Accessary pack)
4.2
REAR FLUE OPTIONS - ALL MODELS
▶ Fit the air inlet telescopic sections [2 & 3] to the boiler flue cowl and
secure the inner section with the clamp [1].
▶ Push the air inlet outer section [3] (see figure 11) through the rear
panel opening until the end of the tube is against the stops [4] on the
clamp assembly [5].
Fig. 6
Rear flue
[1]
Flue clamp
[2]
Telescopic inner section
[3]
Telescopic outer section
[4]
Clamp stops
[5]
Clamp assembly
▶ Drill through the two sections of the flue inlet [2 & 3] with the 3.3mm
drill bit and secure the two sections with the self-tapping screw.
▶ Drill through the tab [6] with the 3.3mm drill bit, into the flue inlet
outer section [3] and secure with the self-tapping screw.
Fig. 7
Drilling detail
[2]
Telescopic inner section
[3]
Telescopic outer section
[6]
Clamp tab
NOTICE:
▶ Ensure all seals are in good condition and seated
properly.
▶ To ease assembly of the flue components, lightly
grease the seals with the solvent free grease supplied.
▶ A terminal guard must be fitted if the terminal is 2 m or
less above a surface that is accessible by people.
80mmØ flue pipe length L in mm
Flue outlet
Boiler
Danesmoor
(2013)
Heatslave II
Camray
Heatslave
Rear
450
465
465
420
Table 1 Flue pipe lengths
1
2
3
4
5
6720807912-05.2Wo
6
7
8
9
10
6720807912
-09.1W
o
2&3
1
4
5
6720807912-10.1Wo
2
6
3.3mmØ
3
Summary of Contents for Worcester Greenstar Oilfit External
Page 10: ...6 720 807 912 2015 10 10 NOTES ...
Page 11: ...6 720 807 912 2015 10 11 ...