Commissioning
Greenstar Utility
ErP -
6 720 821 751 (2018/04)
32
6.6.2
Air damper adjustment
The air damper is factory set according to the values indicated in the
burner settings table for the relevant burner (tables 13 and 14). The
adjustments are for guidance only.
Each installation, has its own unpredictable working conditions: actual
nozzle output; positive or negative pressure in the combustion chamber,
the need for excess air, etc.
All these various conditions may require a different air-damper setting.
The damper is used to precisely adjust the input air flow rate.
▶ Adjust the air damper [2], the setting is displayed in the window [1].
Fig. 47 Air damper adjustment
6.7
Burner commissioning/adjustment completed
▶ When the burner commissioning/adjustment is completed and the
combustion settings are correct:
– Remove the pressure gauge and refit the blanking plug.
– Refit the plastic cover.
– Ensure the oil flexible line/s are routed correctly so to avoid being
damaged or trapped.
– Ensure that the rigid 90° connection at the pump points to the
entry point of the oil supply into the appliance when the appliance
is viewed from the front.
6.8
Operational checks, system controls
▶ Turn the appliance thermostat control to maximum.
Check central heating operation
▶ Open all radiator valves.
▶ Set the programmer to ON for central heating.
▶ Set the room thermostat to maximum.
▶ The burner should be ON along with the circulating pump.
▶ Ensure all radiators are heating up evenly.
– Balance the system to the temperature difference required for
the heating flow and return according to the heating load.
▶ Set the room thermostat to minimum.
The burner and circulating pump should be OFF.
Check hot water operation (if applicable)
▶ Set the programmer to ON for domestic hot water.
▶ Set the domestic hot water thermostat on the cylinder to maximum.
The burner should be ON along with the circulating pump.
▶ Set the domestic hot water thermostat to required temperature.
▶ Set the programmer to OFF for domestic hot water.
-or-
▶ Wait for the domestic hot water to reach required temperature or
lower the domestic hot water thermostat temperature setting to
minimum.
The burner and circulating pump should be OFF.
6.9
Finishing commissioning
Completion of commissioning
When the commissioning has been completed:
1. Locate the bottom edge of front panel onto the supporting ledge on
the baseplate.
2. Locate the ball studs into the ball catches [1] and press the top edge
of the front in to secure.
3. Locate the rear corners of the top panel onto the tabs and press down
firmly on both sides to engage the ball stud catches [2].
Apply pressure at the edges of the appliance panels when securing
to avoid accidental damage.
Fig. 48
6720821571-46.1W
o
1
2
6720821751-24.1W
o
1
2
3
1
1
2
2