Building the Tower
Climb up the inside of the tower
and from the protected position
of the trapdoor, fit horizontal braces as
guardrails (on both sides) to the 14
th
and 16
th
rungs (2 and 4 rungs above the
platform in that order).
Do not climb onto the platform until
all guardrails are in place.
Continue the procedure until the
required height is reached, adding
additional pairs of end frames, diagonal
braces and fitting trapdoor platforms,
as shown on previous steps. At every
platform level, add horizontal braces as
guardrails at 2 and 4 rungs above the
platform (in that order) on both sides of
the platform (as shown in Step 7).
Fit these guardrail braces from the
protected trapdoor position.