6
Fit the next pair of diagonal braces in opposing directions
between the 3
rd
and 5
th
rungs. Add 2 additional end frames.
7
If finishing at this height, (4.2m platform), the fixed deck
should first be repositioned to the 8
th
rung of the tower. Fit a
trapdoor deck alongside it, with the trapdoor next to the
ladder.
Climb ladder and, from a protected trapdoor position, fix
guardrails on 9
th
and 10
th
rungs, in that order, on both sides
of the tower. Add a diagonal brace.
Assembly Procedure 1450 Tower - 3T
16