6
Continue the procedure until the required working height is
reached, adding additional end frames, diagonal braces
and platforms. Always add horizontal guardrails from the
protected position within the trapdoor, (as shown in step 5).
Fit the toeboards (see instruction on page 29).
The tower is now complete.
Assembly Procedure 850 Tower - 3T
21