5
Hold the guardrail with the locking claw (
B
) on your left hand
side. Lift the guardrail by holding the two middle vertical
frame tubes and raise it until the windlatch plate (
C
) and
locking claw (
B
) are level with the horizontal rungs of the end
frames, at the platform level (4
th
rung).
Move the guardrail to the right to fully engage the right hand
U-brackets (
E
) onto the vertical of the right hand end frame,
with the windlatch plate resting on the horizontal rung at the
platform level.
Move the left hand side of
the guardrail inwards.
Move the frame to the left to
engage the left hand U-
brackets (
E
) with the vertical
of the left hand end frames.
Position the locking claw (
B
)
over the rung of the left hand
end frame at the platform
level (4
th
rung) and pull
downwards to lock the claw.
Engage the windlatch (
C
)
over the rung of the right end
hand frame.
6
Repeat this procedure to fit
the second guardrail on the other face of the tower.
Assembly Procedure - Advanced Guardrail
24
B
C