3-10
255 Conquest
Section 3 • Systems & Components Overview & Operation
R
NOTICE
The seacock MUST be in the OPEN position.
Running the pump dry may cause damage to
the unit.
NOTICE
The seacock MUST be in the OPEN position.
Running the pump dry may cause damage to
the unit.
Operation
The Raw water system includes a 3.5 GPM (13.25L)
pump, seacock with auxiliary pump, an 18 gal (68
L) livewell located in the port stern and a raw water
hose connection located on the lower forward section
of the port gunnel..
The seacock must be set in the OPEN position for
the raw water system to function. The seacock and
raw water pump can be accesseD through a hatch on
the aft wall of the cockpit.
Raw Water System
Raw Water System
Fig. 3.10.1
CLOSE
1
2
3
4
5
6
7
3.5 GPM RAW WATER PUMP
RAW WATER WASHDOWN CONNECTION
18 GAL (68 L) LIVEWELL
LIVEWELL BOTTOM DRAIN HOSE
COCKPIT DRAIN
LIVEWELL FILL
10
11
LIVEWELL OVERFLOW STRAINER
LIVEWELL FLOW CONTROL VALVE
THU-HULL DRAIN
SEACOCK
12V/800 GPH PUMP
8
9
Make sure that the hull seacock is set in the open
position and turn ON The “LIVEWELL/RAW
WATER” switch on the control station switch panel
(See fi gure 2.14.1) by pushing on the top of the
switch. The raw water pump will be activated and
the system will become functional.
1
2
3
4
5
6
7
10
11
8
9
Summary of Contents for 255 Conquest
Page 2: ......
Page 18: ...xviii 255 Conquest R THISPAGE INTENTIONALLY LEFT BLANK ...
Page 90: ...4 6 255 Conquest Section 4 Electrical System R Switch Panel Diagram Fig 4 6 1 ...
Page 91: ...4 7 Section 4 Electrical System 255 Conquest R DC Wiring Diagram Fig 4 7 1 ...
Page 94: ...4 10 255 Conquest Section 4 Electrical System R THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 106: ...5 12 Section 5 Care Maintenance R 255 Conquest THIS PAGE LEFT INTENTIONALLY BLANK ...