2-1
Boat Operation
Section 2
Pre-operation Checklist
Review all the items on this checklist each time you
prepare for a mission. Resolve any issues before you
begin your mission.
❑
Drain plug installed in hull
❑
Hull in seaworthy condition
❑
Check regional weather advisories
❑
Boat operator’s manual on-board
❑
Safety equipment on-board
❑
EPIRB in mission-ready condition
❑
VHF radio operational
❑
Radio’s DSC system operational
❑
Chart plotting unit operational
❑
Adequate fuel load for mission
❑
Fuel tanks and fuel hoses good condition
❑
Fuel filter in good condition
❑
No water in water separator
❑
Navigation lights operational
❑
Signal horn operational
❑
Bilge pump operational
❑
Bilge pump float switch operational
❑
Engine starting battery in good condition
❑
House battery in good condition
❑
Battery OFF-ON switches correctly set
❑
Engine control lever in NEUTRAL
❑
Ignition shutoff clip and lanyard in place
❑
Engine in full Tilt Down position
❑
Engine operational and normal
❑
Steering system operational and normal
!
CAUTION
Test your bilge pump and float switch before
each mission. Manually activate the float
switch when the rocker switch is in the AUTO
position and verify pump operation. Clear away
any debris that might restrict the pump or float
switch.
Summary of Contents for Boston Whaler 15 Guardian Series
Page 16: ...1 8 Section 1 Safety Deck Occupancy Chart...
Page 18: ...1 10 Section 1 Safety Warning Label Chart 1 2 4 3 5 6 7 8 9 0 A...
Page 20: ...1 12 Operator Notes...
Page 74: ...5 12 Operator Notes...
Page 82: ...6 8 Section 6 Boat Maintenance Trailer Setup...
Page 90: ...6 16 Operator Notes...