background image

08 

|

 

MAINTENANCE INFORMATION

A well-designed system needs minimal maintenance.

Maintenance should be carried out at least once a year by well-trained personnel.

Check that the mounting hardware is properly tightened. Check if cables, nuts, and bolts are secure and not loose. 
Tighten any loose components if necessary.

Check ground resistance performance and water resistance of connecting cables, grounding cables, connectors, and  
any other connections.

Verify that the   electrical and mechanical connections are free from corrosion.

Do not touch the live part of the wire, cable, or connector directly, but only with safety equipment (insulating tools and 
electrical protection) when necessary.

Use an opaque cloth or other opaque materials to cover the front side of the modules during the maintenance. When 
exposed to sunlight the module may produce high voltage which can cause injury and even death.

In the event that modules need to be cleaned, clean modules with a soft cloth together with a mild detergent and clean 
water. To avoid severe thermal shocks, which might damage the module, use water at a similar temperature to the 
modules being cleaned.

09 

|

 

WARNING INFORMATION 

Contact your installer immediately if you suspect your system is not working properly. For any warranty related concerns 

contact our Boviet Solar after sales service team at  service@boviet.com or your sales contact.

WARNING: The PV system must be shut down first if it needs any electrical maintenance. Improper maintenance may 
cause burns and/or electrical shock, which can both be lethal. 

CONTACT

Address:   
Website:

2107 N. 1st Street, Suite: 550, San Jose, CA, USA, 95131
bovietsolar.com

16

Disclaimer: The information included in this document is subject to change without any notice and is provided for informational purposes only. No 
contractual rights are established or should be inferred because of user’s reliance on the information contained in this PV module installation manual 
Please contact with Boviet Solar’s local offices for more up-to-date product information.

Summary of Contents for Vega BVM6610M S-H-HC-BFDG Series

Page 1: ......

Page 2: ...ING AND STORAGE INFORMATION SAFETY PRECAUTIONS INFORMATION ENVIRONMENTAL CONDITIONS INFORMATION 4 1 ENVIRONMENTAL CONDITIONS 4 2 INSTALLATION SITE MOUNTING OVERVIEW 5 1 MOUNTING 5 2 MOUNTING WITH BOLT...

Page 3: ...when it is electrically in accordance with the instructions presented below and the National Electrical Code Any module without a frame laminator should not be considered to comply with the requireme...

Page 4: ...d to prevent danger damage and failure DO NOT touch electrically active parts of the panel such as the output wiring without the adequate safety protection Bare contact may cause an arc or shock that...

Page 5: ...ay by trees buildings or any other surrendering objects 2 Solar modules should normally be mounted facing the equator at an angle to the horizontal plane equivalent to the latitude of the installation...

Page 6: ...OS components The system installer or trained professional personnel must be responsible for the PV system s design installation mechanical load calculation and security of the system Regardless of th...

Page 7: ...H HC BF DG 120 cells BVM6610M XXXL H HC BF 120 cells 1727 1002 1004 35mm A 960 B 1200 6 158 full cell module BVM6612M XXXL H BF DG 144 cells BVM6612M XXXL H BF 144 cells 2015 1002 1004 35mm A 900 B 1...

Page 8: ...under any circumstances as this will not void the warranty 5 2 MOUNTING WITH BOLTS There are four 4 9 14mm and six 7 10mm size mounting holes at each panel to mount the modules on a supporting structu...

Page 9: ...F DG 144 cells BVM7612M XXX H HC BF 144 cells 2296 1134 35mm J 350 K 500 2 166 Half cut module BVM6612M XXXS H HC BF DG 144 cells BVM6612M XXXS H HC BF 144 cells 2135 1046 35mm J 385 K 530 3 166 Half...

Page 10: ...Figure 5 PV Module I J and K represent the range of the fixture A and B represent the module size Figure 6 PV Module I PV module installed at long side with clamp fitting method 09...

Page 11: ...Figure 7 PV Module I Short Side Mounting Figure 8 PV Module I PV module installed at short side with clamp fitting method 10...

Page 12: ...nuts bolts star washers lock washers and the like have not been evaluated for electrical conductivity or for use as grounding devices and should be used only for maintaining mechanical connections an...

Page 13: ...id quality AC Power Boviet Solar produces following models XXX presents the power range Table 4 PV Module Model No PV Module Type PV Module Model 1 Bifacial Double Glass module BVM7612M XXX H HC BF DG...

Page 14: ...Current A 15 20 40M M2 4 Insulation resistance 40M 5 Application Class Class A 6 Standard Test Conditions STC AM 1 5 E 1000W m2 T 25 C 07 WIRING AND NOTES All wiring should be performed by qualified...

Page 15: ...www amphenol Solar com 7 Amphenol Industrial Operations Helios HH4 Assembled Helios HH4 Assembled www amphenol Solar com 8 Zhe Jiang Renhe 05 6 2q 05 6 2q www renhesolar com cn index php Table 6 PV M...

Page 16: ...Website 1 PV JM608 jmthy com 2 PV JM601 jmthy com 3 PV JM601A jmthy com 4 PV KSTA 611 UR Male PV KBTA 611 UR Female staubli com en connectors 5 PV KSTA EV02 611 UR Made PV KBT4 EV02 611 UR Female sta...

Page 17: ...need to be cleaned clean modules with a soft cloth together with a mild detergent and clean water To avoid severe thermal shocks which might damage the module use water at a similar temperature to th...

Reviews: