12. Remove the primary sun gear.
13. Remove the cable drum closure. Install two (2) short
½-13 UNC bolts through a short length of chain, or
insert two (2) ½-13 UNC eyebolts in to the puller
holes. Lift the drum closure straight out of the cable
drum. It may be necessary to tap the drum closure
with a soft hammer to break it free. Remove and dis-
card the outer o-ring and inner seal. Inspect the
bearing for wear or damage.
14. Remove the ring gear adapter from the end of the
ring gear.
15. Remove the thrust bearing set from the planet car-
rier.
16. Remove the primary planet carrier assembly. Refer
to "Planet Carrier Assembly Service" section for fur-
ther information.
17. Remove the thrust washer that was located
between the planet carrier assemblies and the out-
put sun gear.
33