Installation
SS-3N/BIR3/STD, SS-3N/BIR3/WH
Bradley
• 215-1496 Rev. J; ECN 17-08-026
9/7/2018
9
WARNING! The SS-3N/BIR3 Express must be connected to the 6 VDC battery. Connection to 110 VAC can
cause personal injury and will result in damage to the electronics. Connection of leads other
than shown may cause permanent damage to the sensor.
NOTICE! To avoid activating the sprayhead valve, make sure to connect the sensor cable plugs to the circuit board
before inserting the batteries into the battery holder. If the cable is connected or disconnected while the
batteries are installed, the station will activate and continue running for 75 seconds.
Red Supply Tubing
Green Supply Tubing
Black Supply Tubing
To Drain
Stub-Out
5
Install the Drains
6
Connect Electrical and Sprayhead Supplies
B
Insert the batteries into
the battery holders.
D
Loosen the compression nuts.
Push the sprayhead supply tubes firmly into
the tube connectors until they are fully seated
Tighten the compression nuts by hand.
B
Snap the battery cable
plugs into the female
circuit board plugs.
A
Snap the sensor cable
plugs from the sprayhead
into the proper valve’s
circuit board.