Braided Hose
Cold Supply Inlet
Hot Supply
Inlet
Stop/Check Valve
Vernatherm™ TMV
Air Valve Assembly
1/4-20 x 1/2" Screws
Installation
MF2904/AST4
7
Bradley Corporation • 215-576 Rev. X; EN 06-915C
2/1/07
4
Install valve assembly
NOTE!
The letter “H” on the Vernatherm™
Mixing Valve indicates hot water supply
inlet.
The thermostatic mixing valve requires
at least 115° F water from the hot water
side for proper operation. As with all
lavatories, there will be a delay in
obtaining warm water. If the hot water is
too far away from the washfountain, a
circulating pump may be required.
CONNECT THE 1/2" NPT FEMALE END OF THE STOP/CHECK
VALVES TO THE ROUGH-INS.
A
CONNECT THE SUPPLY HOSES TO THE STOP/CHECK VALVES.
B
INSIDE THE PEDESTAL, INSTALL THE TWO 1/4-20 X 1/2" SCREWS (SUPPLIED WITH VALVE ASSEMBLY) IN THE
MOUNTING HOLES ON THE SIDE OF THE LEFT PEDESTAL PANEL. DO NOT THREAD THE SCREW COMPLETELY
INTO THE PANEL, BUT ALLOW 5/16" OF THE SCREW TO BE EXPOSED.
C
MOUNT THE VALVE BRACKET TO THE LEFT SIDE OF THE PEDESTAL AS SHOWN.
D
CONNECT THE SUPPLY HOSES TO THE VERNATHERM™ TMV VALVE ASSEMBLY.
E
FOR OPTIONAL SINGLE TEMPERED SUPPLY: ATTACH THE STOP/CHECK VALVE TO THE 1/2" TEMPERED SUPPLY LINE.
CONNECT THE STOP/CHECK VALVE TO THE SOLENOID VALVE ASSEMBLY WITH THE FLEXIBLE SUPPLY HOSE.
F