Installation
SN2003/IR, SN2023/IR
Bradley Corporation
• 215-1073 Rev. H ; EN 10-00-015
7-12-2010
5
A
Remove Access panel and with
the help of another person, place
unit in position against wall.
1
Install Unit
Rough-in of plumbing lines and wall braces must be
completed before unit can be properly installed.
C
Install suitable wall anchors (supplied
by installer) for 3/8" bolts at the marked
locations. Secure unit to wall.
Water Supply Gang
Valve Assembly
B
Ensure unit is level, shimming fl oor unit if
necessary. Mark the wall anchor locations.
2
Connect Water Supply to Valve Assembly
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Hot Supply Inlet
Cold Supply Inlet
Vernatherm TMV
Braided
Hose
OPTIONAL Tempered Line Adapter
Assembly (S39-685)
Stop/Check Valve
A
Connect 1/2" NPT female end of stop/check
valves to supply lines. Connect supply hoses
to hot and cold inlets of the Vernatherm TMV.
B
OPTIONAL TEMPERED LINE CONNECTION: Connect 1/2"
NPT female end of stop/check valve to supply line. Connect
Tempered line adapter to Gang Valve Assembly as shown.
Water Supply Gang
Valve Assembly
Do not turn on water until Step 4 is completed!