Thermostat
5
1
7
1
O-Ring
8
1
O-Ring
Item Qty
Description
Repair Kit S65-259
9
6
5
4
3
2
1
7
8
Strainer
(173-028)
Valve Body
Spring
Thermostat
Piston
Stem
O-Ring
O-Ring
Cap
Nut 3/8-24 Hex Jam
10
Seal Cup
11
2
S59-4004, S59-4004XS
Installation
9/11/2013
Bradley
•
215-1506 Rev. H; EN 13-09-011
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance
department. Installation and final temperature adjustment along with compliance and conformity to local codes
and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation. To comply with ASSE 1017, this valve must be
installed with check valves on the hot and cold inlets.
Product warranties may be found under ”Product Information” on our web site at www.bradleycorp.com.
Installation
TH
IS
SID
E
UP
Packing List
Parts List
TEMPERATURE
ADJUSTMENT
STEM
TEMPERATURE
LOCKING
NUT
MOUNTING
BRACKET
140-934
MOUNTING
SCREW
P18-054
SUPPLY
HOSES
CHECK STOPS
S45-2082 Optional
Checkstop and
Supply Hose Kit
OBSOLETE