AVS
Series
29
3.0
Installation
•
Electrical Requirements
•
Field Wiring
WARNING
!
Electric Shock
Field wiring to the tube heater must be connected and grounded in accordance with
national, state, provincial and/or local codes. In the United States refer to the most current
revisions to the ANSI/NFPA 70 Standard and in Canada refer to the most current revisions
to the CSA C22.1 Part I Standard.
Wiring
Figure 3.22
•
Field Wiring Diagram
•
Multiple Line Voltage Heater(s), Single 120V Control
0VA - 0
S
NOTE:
T
must
A
0VA
0VA
Summary of Contents for AVS-40N
Page 42: ...AVS Series 42 Notes...