Page 3
Certification Checklist Diagnostic Procedures
Use the following adjustment procedures should the lift not function as described in the certi
fi
cation checklist.
These procedures must be followed in order for the lift to be FMVSS 403/404 compliant.
• Vehicle movement is prevented unless the platform is fully stowed.
1. Verify lift stowed signal - pin 7 on the pump module has a +12 volt output signal from lift OR pin 9 has
a ground signal from lift (depends on interlock used).
2. Refer to the interlock installation instructions.
• Lift operation shall be inhibited unless the vehicle is stopped and vehicle movement is prevented.
1. Verify vehicle secure signal (pin 6) has a +12 volt input signal from interlock.
2. Refer to the interlock installation instructions.
• The platform will not fold/stow when occupied.
1. Position the platform at the
fl
oor level loading position.
2. Loosen the locknut on the dual relief valve adjustment (do not remove locknut). See illustration below.
3. Turn the adjustment screw counter clockwise until the platform does not fold when the Fold button is
pressed.
4. Turn the adjustment screw clockwise in 1/4 turn increments and press the Fold button until the plat-
form folds completely (Note: return the platform to
fl
oor level position after each attempt to fold the
platform).
5. Turn the adjustment screw an additional 1/8 turn after the platform folds successfully.
6. Tighten the locknut without moving the adjustment screw.
7. Verify the platform will not stow while occupied.
Platform Relief Valve
Adjustment
(Located beside Backup Pump)
DO NOT adjust this valve!
(Located beside Solenoid Valves)