Maintenance is necessary to
ensure safe and troublefree lift
operation. General preventive
maintenance consisting of
inspections of your lift system and
cleaning the lift should be a part
of your routine.
The VL955 has been designed
with many self-lubricating compo-
nents. Lubricate the pivot points
specified on page 34 approxi-
mately every four weeks (or 400
cycles) with a light penetrating
type oil (30 weight or equivalent).
Severe conditions (weather,
environment, heavy usage, etc.)
may require more frequent
lubrication.
Preventive maintenance visual
inspections and lubrication
procedures
do not
take the place
of the procedures specified in the
Maintenance and Lubrication
Schedule provided in the appli-
cable lift installation and service
manual. The procedures outlined
in the Maintenance and Lubrica-
tion Schedule
must be per-
formed at the recommended
scheduled intervals by an
authorized Braun Corporation
service representative who has
attended and been certified by
The Braun Corporation Sales
and Service School
.
If the scheduled maintenance
and lubrication procedures are
not being performed, or if there is
any sign of lift damage, wear,
abnormal condition or improper
operation,
discontinue lift use
immediately.
Contact your sales
representative or call The Braun
Corporation at 1-800-THE LIFT.
One of our national Product
Support representatives will
direct you to an authorized
service technician who will
inspect your lift.
Maintenance and Lubrication
WARNING
Maintenance and
lubrication proce-
dures must be per-
formed by authorized
service personnel as
specified in the
applicable installa-
tion/service manual.
Failure to do so may
result in serious
bodily injury and/or
property damage.
Page 33