background image

B

HELPFUL TOOLS 

CONFIGURATION AND PARAMETERS

Adjustable Wrench

Marking Gauge and Pencil Tape Measure

Neutral Mildew Resistant 

Silicone Sealant

C

D

Level

Safety Glasses

POINTS FOR ATTENTION BEFORE INSTALLATION

  

AC220V~AC240V

Load configuration parameters

50HZ
600W
30MA
15mA

12A

20MΩ

IPX5

Type of Load

 Rated Loading Voltage

Rated Loading Power   

Others

Operating Conditions and Properties

Rated voltage
Rated Amperage
Insulation resistance

Rated Frequency
Rated Wattage
Leakage Current
Leakage current protection

Air Pump

Water-Resistant Grade

600W

300W

AC230V
AC230V

  

Optional

Heater

1. To facilitate transportation and protect product from damage that may occur in delivery,each bathtub is packed in cartons. In order to avoid 

quality dispute,please kindly check product before installation. Or Bravat should not be liable for any quality issue raised after installation.

2. Please read the instruction carefully before beginning to install. 

3. Please follow steps in the instruction to install this product or may result in costly mistake. Bravat shall not be responsible for any loss from 

that mistake.      

4. Professional help is required for installation of this product.

5. Shut off power supply before installation.

6.Keep the area around the Air Pump clean and free of debris,to prevent air duct clog of pump and restriction of  air flow through Air Pump. 

Inspection 

(1)  Check and ensure all switch and accessories are in good condition.
(2)  Check and ensure bathtub surface is free of hit and damage.
(3)  Check and ensure pipe connection is firm and compact.
(4)   Before starting installation, check and ensure bathtub,all connections and accessorie are free of leaks that may occur during delivery. 

Attention points at Installation 

(1) To facilitate maintenance and clean, we recommend to install bathtub on finished floor with ceramic tile or terrace with ground tile. 

(2) To facilitate install and maintenance bathtub’s key parts like drainage system, control system and air pump, DON’T wall up bathtub with 

     cement or tiles.   

(3) DON’T lift pipes or use pipes as lift when transport bathtub.

(4) DON’T remove bathtub protecting film during installation.

(5) DON’T take bathtub out of package for installation until wall and floor preparation finished. 

Guangzhou BRAVAT Industrial Co., Ltd.

       Service Hot Line: 800-820-5330

Web:www.bravat.com

2

Summary of Contents for B25712W-6

Page 1: ...ge experience 4 Adjustable airflow free massage intensity setting 5 BODY CONTOUR airjet design aesthetic outline comfortable and ideal for lying bath 6 Smart cleaning system ensure hygienic and health...

Page 2: ...be responsible for any loss from that mistake 4 Professional help is required for installation of this product 5 Shut off power supply before installation 6 Keep the area around the Air Pump clean and...

Page 3: ...pump icon and lamp icon will be lit simultaneously and the timing will be cancelled touch the icon again the orange backlight will be lit simultaneously and the timing is set The settings become vali...

Page 4: ...floor at the same time F INSTALLATION STEP Hot Supply Power Socket Cold Supply Drainage outlet 1 2 3 4 1 2 3 4 N L 220 240V 50Hz 60Hz 910W IPX5 I TYPE BTU1 0 Connection Blueprint Of Massage Tub MAIN...

Page 5: ...stration recommended by our company for the Drain Pipe P9098N series Switch off the water drainage pour water into the bathtub and then checkwhether there is water leakage Make sure that the overflow...

Page 6: ...r to facilitate future maintenance Follow the drainage accessory installation instruction and connect drainage lines and supply lines with bathtub using silicon sealant or other soft sealants to seal...

Page 7: ...y if using in high hard water area where high calcium content in water would leave yellow spot after dirt attaching on bathtub surface 3 Please use soft cloth with neutral cleaner or soap to clean bat...

Reviews: