Please embed supply lines,drainage lines, and power socket according
to distance from bathtub rim to finished wall. Power socket should be
located above 20cm from finished floor and close to bathtub motor.
(Drainage outlet should be 30mm protruding from finised floor)
Adjust leveling feet to keep top rims at horizon, and ensure all feet
firmly seat on floor at the same time.
F
INSTALLATION STEP
Hot Supply
Power Socket
Cold Supply
Drainage outlet
1
2
3
4
1
2
3
4
N
L
220- 240V~ 50Hz/60Hz
910W
IPX5
I TYPE
BTU1.0
Connection Blueprint Of Massage Tub
MAIN CONTROL BOX
Control Panel
Techniques and parameters are subject to change without notice.
GN-YE
Heat Part
GND
BN
BU
GN-YE
GND
Blower
Electric Panel
Connection Blueprint
Function Key of Air Pump
Function Key of Lighting
Power On/Off
Function Key of Backup Heating
Guangzhou BRAVAT Industrial Co., Ltd.
Service Hot Line: 800-820-5330
Web:www.bravat.com
4