background image

B

HELPFUL TOOLS

CONFIGURATION AND PARAMETERS

Adjustable Wrench

Marking Gauge and Pencil Tape Measure

Neutral Mildew Resistant 

Silicone Sealant

C

D

Level

Safety Glasses

POINTS FOR ATTENTION BEFORE INSTALLATION

1.To facilitate transportation and protect product from damage that may occur in delivery,each bathtub is packed in cartons. In order to avoid 
   quality dispute,please kindly check product before installation. Or Bravat should not be liable for any quality issue raised after installation. 
2.Please read the instruction carefully before beginning to install. 
3.Please follow steps in the instruction to install this product or may result in costly mistake. Bravat shall not be responsible for any loss from 
   that mistake.
4.Professional help is required for installation of this product.
5.Shut off power supply before installation.
6.Keep the area around the Air Pump clean and free of debris,to prevent air duct clog of pump and restriction of  air flow through Air Pump.
 

Inspection

(1) Check and ensure all switch and accessories are in good condition.
(2) Check and ensure bathtub surface is free of hit and damage.
(3) Check and ensure pipe connection is firm and compact.
(4) Before starting installation, check and ensure bathtub,all connections and accessorie are free of leaks that may occur during delivery. 

Attention points at Installation 

(1) To facilitate maintenance and clean, we recommend to install bathtub on finished floor with ceramic tile or terrace with ground tile.
(2) To facilitate install and maintenance bathtub’s key parts like drainage system, control system and air pump, DON’T wall up bathtub 
     with cement or tiles.  
(3) DON’T lift pipes or use pipes as lift when transport bathtub.
(4) DON’T remove bathtub protecting film during installation.
(5) DON’T take bathtub out of package for installation until wall and floor preparation finished.
(6) NO bulbs and open fires are allowed to place in bathtub during installation.
(7) NO stuff like sand, cement or other sundries are allowed to place in bathtub as that would likely  damage bathtub surface.
(8) NO solvent like paint or glue are allowed to contact with bathtub.

2

AC220V~AC240V

Load configuration parameters

50HZ

900W
30MA
15mA

12A

20MΩ

IPX5

Type of Load

 Rated Loading Voltage Rated Loading Frequency

Others

Operating Conditions and Properties

Rated voltage
Rated Amperage
Insulation resistance

Rated Frequency
Rated Wattage
Leakage Current
Leakage current protection

Water-Resistant Grade

600W

230V

230V

300W

Heater

Air Pump

Reviews: