background image

B

HELPFUL TOOLS 

Before installing the new mixer, it is essential that you thoroughly flush through the supply pipes in order to remove any remaining swarf, 
solder or other impurities. Failure to carry out this simple procedure could cause problems or damage to the workings of the mixer. 
Work water pressure

0.5-5kgf/cm² (Including cold and hot).    

If the pictures and statements in the ‘Installation Specifications’  is unconfirmed with practicality, please take practicality as standard. 

Points for attention before installation

INSTALLATION STEP

C

FAUCET OPERATION 

           

D

SPECIFICATION

E

Application:

Operation with unpressurized storage heaters is not possible.
Specifications

If static pressure exceeds 5 bar, a pressure-reducing valve 

must be fitted.
Avoid major pressure differences between hot and cold water 

supply.

GB

This technical product information is exclusively 

for the installer or trained specialists.

Please pass these instructions on to the user.

min. 0.5 bar – recommended 1 – 5 bar

r

a

b

 

0

1

 .

x

a

m

:

e

r

u

s

s

e

r

p

 

g

n

it

a

r

e

p

O

r

a

b

6

1

:

e

r

u

s

s

e

r

p

 t

s

e

T
Flow rate at 3 bar flow pressure

n

i

m

/l

 

5

,

1

2

 .

x

o

r

p

p

a

:

h

t

a

b

 r

o

  

 

n

i

m

/l

 

8

1

 .

x

o

r

p

p

a

:r

e

w

o

h

s

 r

o

  

 

C

°

 

0

8

 .

x

a

m

e

r

u

t

a

r

e

p

m

e

t

e

l

n

r

e

t

a

w

 t

o

H

Recommended (energ

C

°

 

0

6

:)

g

n

i

v

a

s

 

y

Installation:

Flush piping system prior and after installation of 

fitting thoroughly (Consider EN 806)!

Fitting a temperature limiter is possible 
The projection can be increased by 20mm, 

extension 

Function:

Check connections for leaks and check function of 

fitting.

Flow is diverted automatically from shower outlet to 

bath inlet when the fitting is closed.

Maintenance:

Inspect and clean all components and replace if 

necessary.

Shut off water supply for maintenance work.

When installing the cartridge, ensure that the 

seals are correctly seated.

Tighten the screws evenly and alternately.

Replacement parts: see exploded drawing 

(* = special accessories)

Care: see Care Instructions

Flow pressure:

Spanner

 

Teflo tape

Screwdriver

Flashlight

 

 

Tape Measure

Impact Drill

Pencil

3

15121632

2

15121632

Designed and developed by Bravat/Dietsche Germany

Designed and developed by Bravat/Dietsche Germany

1

2

3

Hot

Cold

5

6

4

Hot

Cold

Open

Close

Open drainage 

Close drainage

Reviews: