POP-UP INSTALLATION STEP
D
GF4354/A1/20110726
Service Hot Line
8008205330
1
2
3
4
5
Drain body
Mounting nut
Rubber washer
Gasket
Drain plug
1
1
1
1
1
Close drainage
Open drainage
2. Press down pop-up to close drainage.lift
pop-up to open drainage.
6
Rubber washer
1
7
Mounting nut
1
8
Liner
1
(Note: Don’t overtighten nut or basin may be crack.)
Nut.
Nut(5) onto Drain Body from underside, tighten
3. Assemble Gasket(3), Rubber Washer(4) and
2. Insert Drain Body into basin mounting hole.
1. Disassemble Nut(8), Rubber Washer(4) and
Gasket(3).
4. The sealing Rubber Washer(6), liner(7)set into
The nut(8) ,tighten Nut
.
Guangzhou bathone industrial Co., Ltd.