background image

FAUCET AND POP-UP OPERATION

E

F

MAINTENANCE

CAUTION: Always turn water OFF before removing existing or 

                  disassembing the faucet. Open faucet handles to 

                  relieve water pressure and insure that complete water

                  shut-off has been accomplished. 

To keep the surface clean and bright, please clean 

the faucet regularly,please abide by the following 

procedures:

1. Use rinsing water and soft cloth, clean bilge and bilge 

    membrane on the surface to the best of the abilities. 

2. Cleaned the residua with the following cleansers only.

    

    Soft liquid cleanser.

    Colorless glass cleanser, totally soluble powder cleanser 

    without abrasive capability.(Mixed by instructions.)

    No abrasive cleansers waxes

    Never use cleanser, emery cloth or handkerchief which can

    rub.

    Never use cleaners containing abrasive cleansers, 

    ammonia,bleach, acids, waxes, alcohol, solvents or other

    products not recommended for chrome.

3. After cleaning, use rinsing water to clean all cleanser

    immediately and drying with a soft cotton cloth.

4. Carefully dismantle the aerator regularly, rinse under clean 

    running water until any loose debris is cleared to avoid the 

    influence to water outflow.

Open

Close

(Hot)

(Cold)

1.Pull Right Handle to turn on water, and down

   to turn off. 

2.Turn Handle towards side with red mark to

   adjust hot water volume, and towards side

   with blue mark to adjust cold water.

GF4354/A1/20110726

     

Service Hot Line

8008205330 

Guangzhou bathone industrial Co., Ltd.

Reviews: