3
ii-B409-DW-10A
It is
REQUIRED
to visually check the Vacuum gauge on each
and every Bravo Systems Double Wall product and write on its
FAX report
Vacuum level
,
name of observer
, and
date
for
every DoubleWall Sump.
A)
There is a failure to comply with the Required written report guidelines as stated above.
B)
Double Wall Products are DOUBLE-STACKED, stored or shipped in a negligent way.
C)
Any packaging or wrapping materials are removed before the item reaches It’s destination.
D)
Double Wall Sump Products, Failure to call Bravo Systems If Vacuum level on product is
less than 12” HG (Vacuum) (323) 888-4133, refer to sump for further details.
WARRANTY IS VOID:
IF ANY OF THE FOLLOWING OCCUR
BEFORE PENETRATING FIBERGLASS
WALLS
ENSURE THAT EACH DOUBLE WALL
FIBERGLASS SUMP IS HOLDING VACUUM
E)
Double Wall Sump Products are tested per the SB989 Testing procedures. The interior
of these sumps must
NOT
be filled with liquid to any level.
If there is any indication or suspect damage, you must mark the freight paperwork
“Suspect Freight Damage” as directed by your Contractor Warranty sheet.
F)
Double Wall Sumps are filled with an unapproved interstitial fluid, or if adhesives or
sealants are used that are not Bravo-approved.