6 Ussc
HEATER
TOP
WELD
TAB
5/16-18 x 1-1/2
BOLT
Tools and Materials Needed For Installation
You will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A non-combustible floor protector as
specified in this manual. All chimney and chimney connector components required for your particular chimney installation.
Assembly
Flue Collar Assembly: (Factory Installed)
1. Mount the flue collar to the top of the unit as shown using the (3)
5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld
tabs provided in the parts box.
Side view of flue collar
mount to heater top
INSTALLATION
SAFETY NOTICE
•
IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE FIRE MAY RESULT. TO REDUCE
THE RISK OF FIRE, FOLLOW THE INSTALLATION INSTRUCTIONS.
• CONSULT YOUR MUNICIPAL BUILDING DEPARTMENT OR FIRE OFFICIALS ABOUT
PERMITS, RESTRICTIONS AND INSTALLATIONS REQUIREMENTS IN YOUR AREA.
• USE SMOKE DETECTORS IN THE ROOM WHERE YOUR STOVE IS INSTALLED.
• KEEP FURNITURE AND DRAPES WELL AWAY FROM THE STOVE.
• NEVER USE GASOLINE, GASOLINE-TYPE LANTERN FUEL, KEROSENE, CHARCOAL
LIGHTER FLUID, OR SIMILAR LIQUIDS TO START OR “FRESHEN UP” A FIRE IN THIS
HEATER. KEEP ALL SUCH LIQUIDS WELL AWAY FROM THE HEATER WHILE IT IS IN
USE.
• IN THE EVENT OF A CHIMNEY FIRE, PUSH THE AIR CONTROL FULL CLOSED TO DEPRIVE
THE FIRE OF OXYGEN. CALL THE FIRE DEPARTMENT.
• DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM.
• A SOURCE OF FRESH AIR INTO THE ROOM OR SPACE HEATED SHALL BE PROVIDED
WHEN REQUIRED.
Summary of Contents for SPG9000
Page 21: ...Ussc 21 NOTES ...