MAINTENANCE
51
9.
Replace the O-ring (C) if necessary. Refit the
cover (B) and the O-ring (C). Make sure that the
eight bolts (A) are refitted and that they are
tightened in the correct order, diagonally
opposite each other. Refer to §
.
10.
Refill the pump housing with lubricant. Refer to
.
11.
Connect the sensor electrically via the 2 meter
(7 feet) long PVC cable (3 x 0.34 mm
2
, 3 x 22
AWG). Refer to the connection scheme, right.
B
A
C
BN
BU
BK
+
pnp
Specifications
*
*
For use in non-explosive atmospheres.
Voltage
10 ... 30 V DC
Current
Max. 200 mA