STEP 8

Snap open Channel door. Run data cable through the Channel upper compartment. Thread
the data cable through the slot to get to the data bracket opening(Fig. 9). Snap close
Channel door (Fig. 10).

Fig. 10

Part #031-6464
Rev. 07.15.03  IM

Bretford

Bretford Ltd.

11000 Seymour Avenue

Technology House

Franklin Park, IL 60131

7 Lake End Court, Taplow

TEL: 847.678.2545

Bucks SL6 0JQ England

800.521.9614

TEL: 01628 603558

FAX: 847.678.0852

FAX: 01628 604923

800.343.1779

www.bretford.com

Note:

 

When repositioning Channel caution should be taken not to obstruct free

movement of jumper.

Summary of Contents for M-SUB

Page 1: ...SUBSTATION AND CHANNEL MODEL Assembly Instructions TOOLS REQUIRED 1 2 WRENCH PHILIPS SCREWDRIVER 3 8 WRENCH ELECTRIC HAND DRILL LIQUID WORKSPACE M SUB...

Page 2: ...kirt Remove Substation Top Cover by pulling it up Disassemble Substation Track Plate and Substation Skins by removing three Substation Track Plate screws Fig 1 Save hardware for reassembly Substation...

Page 3: ...bstation Skirt up and hold it in place with two wooden blocks 7 long Fig 2 Mark bolt hole pattern 3 holes on the floor using hole locations in mounting plate as template Move Substation aside Wooden B...

Page 4: ...2 concrete expansion anchor Drill holes and complete installation using hardware manufacturer s recommended proce dure b For wood floor Drill appropriate holes depending on type of wood for 1 4 x 2 la...

Page 5: ...STEP 4 Remove wooden blocks Reassemble Substation skins and Substation track plate Fig 4 Note If attaching power channels do not reassemble Substation Top Cover at this time...

Page 6: ...Cover Pin Plate Cover Pin Plate Hex Bolt Substation Spider STEP 5 Disassemble Cover Pin Plate and Substation Spider by unfastening the Cover Pin Plate Hex Bolts Save hardware Fig 5...

Page 7: ...Metal Visual Blocker Metal Visual Blocker Screw STEP 6 Disassemble Metal Visual Blocker by unfastening the three Visual Blocker Screws Save hardware Fig 6...

Page 8: ...Substation Skins Install the Channel onto Substation Track Plate Thread the Jumper end through the Substation and plug to Junction Box Fig 7 Close the Substation Skins Reassemble Metal Visual Blocker...

Page 9: ...opening Fig 9 Snap close Channel door Fig 10 Fig 10 Part 031 6464 Rev 07 15 03 IM Bretford Bretford Ltd 11000 Seymour Avenue Technology House Franklin Park IL 60131 7 Lake End Court Taplow TEL 847 67...

Reviews: