Inspection
First, verify that your system has arrived complete and that you have all the parts listed below. If anything is missing, or
appears to be damaged, please contact our Customer Service Team at 800-600-0033 so that we can correct the issue.
A) Brew Sculpture frame with Tri-Clamp mount for Control Panel
B) Touchscreen Control Panel
C) Control Panel Mounting Hardware
1) 1.5” Tri-Clamp Tee, x2
2) 1.5” Tri-Clamp Elbow, x1
3) 1.5” Tri-Clamp Gasket, x4
4) 1.5” Tri-Clamp, x4
D) Copper Heat Exchanger
E) Sparge Arm assembly with Float Switch
F) Pump Assembly with attached manifold
G) Hose Set, consisting of
1) 90” Hose, x1
2) 40” Hose, x2
3) 32” Hose, x1 *The 32” Hose will only have a Quick Disconnect Fitting on one end, the other is open
H) Boil Kettle Package, consisting of
1) Boil Kettle w/ Custom Whirlpool Fitting & pre-installed Whirlpool Maximizer
2) ½” Stainless Ball Valve w/ male Quick Disconnect, x2
3) Dial Thermometer w/ 2” Probe
4) Boil Kettle Digital Temperature Sensor
I) Mash Tun Package, consisting of
1) Kettle w/ Custom Tippy Supports & pre-installed False Bottom Assembly
2) ½” Stainless Ball Valve w/ male Quick Disconnect
3) Dial Thermometer w/ 6” Probe
4) Mash Tun Thermowell
5) Mash Tun Temperature Probe
J) Hot Liquor Tank Package, consisting of
1) Hot Liquor Kettle w/ pre-installed Maximizer
2) ½” Stainless Ball Valve w/ make Quick Disconnect
3) Dial Thermometer w/ 2” Probe
4) Hot Liquor Tank Float Switch/Temperature Probe Assembly
C
ongratulations on your purchase of a MoreBeer! Tippy Dump Brew Sculpture. MoreBeer! Brew Sculptures
represent the very best brewhouses available to the home brewer. The following pages will outline the process of
unpacking and assembling your Brew Sculpture, setting it up for each phase of the brew day, and testing it’s systems
prior to the first brew.
Please read this document completely before assembling or testing your Brew Sculpture.
Assembly
Assembling the system requires only a single crescent wrench. All threaded parts should be pre-taped with Plumber’s Tape
for your convenience. Parts should be tightened until snug, but not with excessive force applied.
First, assemble the Boil Kettle
1. Install the two ball valves onto the male-threaded fittings that are welded into the kettle’s exterior.
2. Install the Thermometer into the female-threaded fitting on the kettle’s exterior.
3. The Boil Kettle will install into the left side burner on the brewing stand.
4. Place the temperature sensor in the boil kettle by hanging it over the kettle’s rim. Remove the silicone plug from the
kettle lid’s notch to accommodate the sensor’s bracket.
BrewSculptures™ is a trademark of
MoreFlavor!
™
Inc. This document is copy written by
MoreFlavor!
™
Inc.
Summary of Contents for 1550DV4NG
Page 1: ...BrewSculpture Digital Tippy Dump Part Number 1550DV4NG ...
Page 13: ......