background image

Install the Pump Assembly by sliding the pump’s base into the bracket on the lower left front of the sculpture frame, with the 

pump head (the part with the fittings attached) facing RIGHT.

Connect an extension cord to the control panel and plug it in to the wall., and, finally, connect to your fuel source.  Aways 

ensure that the main valve and the valves for the individual burners are in the Off position when the system is not in use.

 

E

MoreFlavor, Inc. 

very strongly

 recommends that you have a professional plumber run the lines and provide the 

connection to your household natural gas system, and that a master shut-off valve be installed between the home gas 

system and your Brew Sculpture.

Second, assemble the Mash Tun

1.  Install the ball valve onto the male-threaded fitting on the bottom front of the kettle. 
2.  Install the Thermometer into the female-threaded port on the exterior of the kettle, directly above the ball valve.
3.  Install the shielded thermowell into the port to the right of the analog thermometer in the Mash Tun.
4.  Install the Sparge Arm on the upper lip of the kettle and tighten it in place.
5.  The Mash Tun installs above the upper burner. Place the Tippy Supports into their cradles on the stand with the valve 

facing left, towards the Boil Kettle. You may want to ask a friend to help by pulling out the set pin while you set the 
kettle in place.

6.  Once the Mash Tun is in place on the Sculpture Frame, insert the Mash Tun Temperature Probe into the thermowell.

Next assemble the Hot Liquor Tank

1.  Install the ball valve onto the male-threaded fitting on the bottom front of the kettle.
2.  Install the Thermometer into the female-threaded port on the exterior of the kettle.
3.  Insert the copper Heat Exchanger into the Hot Liquor Tank, taking care to avoid damaging the Thermometer’s probe.
4.  The Hot Liquor Tank installs on the remaining, lowest burner on the stand.
5.  Install the Float Switch/Temperature Sensor in the Hot Liquor Tank by hanging it over the kettle’s rim. Remove the 

silicone plug from the kettle lid’s notch to accommodate the sensor’s bracket.

Mount the Control Panel to the frame

Tri-Clamp connections are a type of pipe fitting used in most commercial breweries in the US. The Tri-Camp system consists 
of two flanged fittings that both have a grooved face, which are pressed together with a ridged gasket between them such 
that the gasket’s ridge fills the fittings’ grooves. A clamp is then secured around the outside of the connected fittings to hold 
them in place.

1.  Connect one of the 1.5” Tri-Clamp Tees to the Sculpture Frame, with the “long” side connected to the frame and the 

“tee” portion pointing to the right, parallel with the ground.

2.  Connect the 1.5” Tri-Clamp Elbow on the end of the Tee opposite the Sculpture Frame so that it points upward.
3.  Connect the second 1.5” Tri-Clamp Tee to the other side of the elbow via the “long” side of the tee, and with the “tee” 

portion facing outwards, away from the Sculpture Frame.

4.  Finally, connect the Control Panel to the end of the Tee that is facing upwards.

Connect the Wiring

Connect the wires coming from the Temperature Sensors, Sparge Arm and the Digital Hot Liquor Burner to their respective 
leads on the Control Panel. The connections are color coded as follows:

1.  Green: Mash Tun Temperature Sensor
2.  Red: Mash Tun Float (Sparge Arm)
3.  White: Boil Kettle Temperature Sensor
4.  Blue: Hot Liquor Tank Temperature Sensor/Float Switch Combo
5.  Yellow: Digital Hot Liquor Burner
6.  Plug the Pump’s power cord into the 110V outlet lead labeled PUMP 2. 

*Note: You can wrap the connecting wires around the open ends of the 1.5” Tri-Clamp Tees that form the support for the Control Panel. This will keep the cables tidy and out 
of the way of the system’s flames

BrewSculptures™ is a trademark of 

MoreFlavor!

 Inc.  This document is copy written by 

MoreFlavor!

 Inc.

Summary of Contents for 1550DV4NG

Page 1: ...BrewSculpture Digital Tippy Dump Part Number 1550DV4NG ...

Page 2: ...of 1 Hot Liquor Kettle w pre installed Maximizer 2 Stainless Ball Valve w make Quick Disconnect 3 Dial Thermometer w 2 Probe 4 Hot Liquor Tank Float Switch Temperature Probe Assembly Congratulations on your purchase of a MoreBeer Tippy Dump Brew Sculpture MoreBeer Brew Sculptures represent the very best brewhouses available to the home brewer The following pages will outline the process of unpacki...

Page 3: ...e Hot Liquor Tank installs on the remaining lowest burner on the stand 5 Install the Float Switch Temperature Sensor in the Hot Liquor Tank by hanging it over the kettle s rim Remove the silicone plug from the kettle lid s notch to accommodate the sensor s bracket Mount the Control Panel to the frame Tri Clamp connections are a type of pipe fitting used in most commercial breweries in the US The T...

Page 4: ...s activated by the control panel and a pilot light which lights the burner when the solenoid is opened As a safety feature the solenoid valve has a thermocouple which detects the presence of the pilot light if the pilot is not lit then the valve cannot open and supply gas to the burner Temperature Probes The system incorporates temperature probes in both the Mash Tun and the Hot Liquor Tank for te...

Page 5: ...n screen keypad to input your desired temperature and press the green ENT button to store the new value and return to the main screen 3 Use your finger to move the HLT slider to the HLT On position to activate the burner As long as you have sufficient water in the kettle and the pilot is lit you should see the on screen indicator for the burner as well as see and hear the flames Set up For Mashing...

Page 6: ...ith the pump turned off close the Pump Outlet Mash Tun ball valves and disconnect the hose from the Mash Tun Do your best to pinch the hose closed or fold it over to keep it as full as possible to keep from losing wort and letting air into the hose 2 Install the hose on the Hot Liquor Tank ball valve 3 Install the remaining hose on the Mash Tun ball valve and let it hang into the Boil Kettle 4 Ope...

Page 7: ...2 From the Boil Mode screen find and press the Edit Boil Timers button 3 The Total Boil Time and each Boil Addition can be set by pressing the 000 to the right of the listing to select it then changing the value with the on screen keypad Store the new value by pressing the green Enter button 4 When you have set all of the alerts that you want press the DONE button to return to the Boil Mode screen...

Page 8: ...2 for a moment to ensure it is working Check the hoses for leaks especially at the ends where the quick disconnects are held in place with hose clamps Check the pump head and valves for leaks as well 8 Program in two 1 minute mash steps at 10F 15F above the current water temperature in the Mash Tun and begin the mash Ensure that the Pump activates and stays on as necessary until the Mash Tun tempe...

Page 9: ...aximizer F H134 22 gal False Bottom G BE756G 22 gal False Bottom Gasket Hot Liquor Tank Assembly Pos Part Number Description A H602 Stainless Ball Valve 1 2 in Full Port B H503B Male Stainless Steel Quick Disconnect w MPT C MT502 Thermometer 3 in Face x 2 in Probe D AG519 Maximizer for Boil and Hot liquor Kettle A B C D E F G H A B C D E F G D A B C B A Spare Parts List While it s unlikely that yo...

Page 10: ...s Steel Quick Disconnect w MPT B H602 Stainless Ball Valve 1 2 in Full Port C MT502 Thermometer 3 in Face x 2 in Probe D AG521 Whirlpool Maximizer A B C D A B A B C D E F Pump Assembly Parts Pos Part Number Description A H503B Male Stainless Steel Quick Disconnect w MPT B H503A Female Stainless Steel Quick Disconnect w MPT C H315HF March High Temperature Brewing Pump D H602 1 2 Full Port Stainless...

Page 11: ...igital Control Panel Cables Please note that the Digital Touchscreen Control Panel is an integral unit and does not have any parts that are serviceable by the end user In the event that your control panel becomes damaged or exhibits a malfunction please contact our Customer Service team to arrange for your control panel to be either repaired at our facility or else replaced A B D E F Control Panel...

Page 12: ...the model supplied E E Do Not modify this Brew Sculpture in any way E E Do Not use an low pressure propane tank that is visibly rusty damaged or out of date E E Do Not use this Brew Sculpture while under the influence of drugs or alcohol 5 5 Always keep the black gas hose away from the flame and heated surfaces of the burner at all times 5 5 Always check for gas leaks before each use by applying s...

Page 13: ......

Reviews: