DETAIL A
A
Install the main shaft
The next few steps involve lifting and installing parts
at the top of the Treadwall. This is about 9 feet off
the ground and some of the parts are quite heavy
and awkward. You should have two 8 foot
stepladders and two people for this part of the
installation.
Position your ladders inside the front of the A-frame
and lift the main shaft into position. Note that the
end with two chain sprockets goes to the right.
Install the shaft at the top of the A-frame with four
bolts.
bolt - 1/2 x 3 1/2
flat washer
flat washer
lock washer
nut
Page 6
M6-V install manual
1-15-16
Bag #M6-1
Two sprockets this side
HARDWARE
BAG: TW6-1