A
Install the shroud
Before raising the shroud into position, make sure that
the front two flange-bolts on each square bearing are
quite loose. There should be a 1/4" gap under the head
of each flange-bolt.
Each square bearing should have only 3 bolts at this
point. The top rear bolt must be installed once you get
the shroud in place.
Use the ladders to raise the shroud and slip the curved
slots under the two front bolts.
Line up the holes with the rear top holes in the square
bearings and slip in the flange-bolts.
Tighten all four bolts firmly at each bearing.
Page 10
M6-V install manual
1-15-16
Slots in shroud slip under bolt heads